Capacities in the Liner Shipping Industry: Are Resource Levels Still Synchronized

Research output: Contribution to conferencePaperResearchpeer-review

Original languageEnglish
Publication date2016
Number of pages20
Publication statusPublished - 2016
EventThe Annual Conference of the International Association of Maritime Economists. IAME 2016 - Hamborg, Germany
Duration: 23 Aug 201626 Aug 2016
Conference number: 24
https://www.iame2016.org/

Conference

ConferenceThe Annual Conference of the International Association of Maritime Economists. IAME 2016
Number24
CountryGermany
CityHamborg
Period23/08/201626/08/2016
OtherAnnual conference of the International Association of Maritime Economists (IAME)
Internet address

Bibliographical note

CBS Library does not have access to the material

Cite this

Schramm, H-J., Prockl, G., & Kolar, P. (2016). Capacities in the Liner Shipping Industry: Are Resource Levels Still Synchronized. Paper presented at The Annual Conference of the International Association of Maritime Economists. IAME 2016, Hamborg, Germany.